Skip to content

Guides

Build America, Buy America, explained plainly

Evergreen guidance on the 55% manufactured-products threshold, the iron & steel melt-and-pour rule and when a waiver applies, for teams bidding on federally funded infrastructure. Where a determination depends on your specific bill of materials or funding agency, we link the cited tool rather than stating a number that might not be yours.

HUD11 Nov 2026 11 min read

HUD BABA requirements: what CDBG, HOME and public housing grantees must certify

HUD BABA requirements: which CDBG, HOME and public housing programmes are covered, the five-unit line that triggers BABA, and the small grants and de minimis waivers.

Read the guide
Certification

BABA certification letter: what it must say, who signs and how long to keep it

What a BABA certification letter must include, who can sign it, how long to keep it, and the false-statement exposure if the claim is wrong. Checklist included.

11 Nov 2026 10 min
Waivers

De minimis waiver under BABA: the 5 percent and $1 million example

The BABA de minimis waiver: OMB's example allows non-compliant material up to 5 percent of applicable project costs, capped at $1 million. What it covers, what it does not, and how it differs from the 55 percent test.

11 Nov 2026 4 min
Solar

BABA compliance for solar projects: modules, racking, inverters

BABA compliance for solar: steel racking must be all-US, while modules, inverters and trackers must exceed 55% US component cost. Classify each item and check the date that binds your project.

11 Nov 2026 3 min
Verdicts and evidence

What a BABA insufficient data verdict means, and how to clear it

Why a BABA determination returns insufficient data rather than a pass or a fail, the input gaps that trigger it, and the evidence that clears each one.

10 Nov 2026 6 min
Evidence and documentation

What evidence is missing from a bill of materials for BABA compliance

The evidence a BABA domestic-content determination needs from a bill of materials: cost, origin, sub-components and process steps, and how to record a gap honestly.

20 Oct 2026 7 min
BABA statute

Build America, Buy America Act: what it requires and who it binds

What the Build America, Buy America Act requires: its three material categories, the 55 percent and melt-and-pour tests, and who it binds.

10 Sep 2026 7 min
FTA

FTA Buy America requirements: the 70% rolling-stock rule

FTA Buy America requirements for transit buses and railcars: 70% domestic content, final US assembly, and FTA's own waivers, stricter than BABA.

12 Aug 2026 9 min
NTIA BEAD

BEAD Buy America rules: what broadband builders must certify

NTIA's BEAD Buy America rules: what the semiconductor waiver exempts, which four equipment categories still need a 55% test, and how to certify.

10 Aug 2026 9 min
EV chargers

EV charger domestic content: the Buy America rules, and what's changing

EV charger domestic content is moving from a 55 percent test toward a proposed 100 percent. What NEVI-funded projects must show today, and what's coming.

6 Aug 2026 7 min
Adjacent laws

BABA vs TAA compliance: which Buy America rule applies to your contract?

TAA compliant does not mean BABA compliant. See how the two domestic-preference rules differ, then check your bill of materials free.

3 Aug 2026 8 min
Thresholds

What is the 55% domestic content threshold under BABA?

The 55% domestic content threshold is the US-origin share of component cost a manufactured product must reach. FHWA applies it to highways from 1 October 2026.

3 Aug 2026 5 min
Compliance workflow

BABA compliance checklist: 9 steps before you certify a bid

A practical BABA compliance checklist for bid teams: confirm the agency, classify each item, check the 55 percent test, and file before signing.

22 Jul 2026 5 min
Enforcement

Buy America enforcement and penalties: what is at stake in 2026

Buy America enforcement penalties are tightening in 2026. What non-compliance actually risks, from funding clawbacks to False Claims exposure, and how to protect a bid with a documented determination.

21 Jul 2026 3 min
Domestic content

How is BABA domestic content calculated? A worked guide

How BABA domestic content is calculated: divide the cost of US-origin components by the total cost of all components. Here is exactly what counts, what is excluded, and why it is measured by cost, not quantity.

21 Jul 2026 4 min
Waivers

The five BABA waivers, and why none of them is a pass

Build America, Buy America recognises five waiver categories: public interest, nonavailability, unreasonable cost, de minimis, and small grants. Here is what each one requires, the objective tests where they exist, and why a waiver is never the same as compliance.

21 Jul 2026 4 min
Iron and steel

Iron and steel: why every step from melt to coating has to be US

The Build America, Buy America standard for iron and steel is all-or-nothing: every manufacturing process, from the initial melting stage through the application of coatings, must occur in the United States. Here is what that covers and where projects trip.

21 Jul 2026 4 min
Manufactured products

The 55 percent rule for manufactured products, worked end to end

Under Build America, Buy America a manufactured product passes only if it is made in the United States AND its US component cost is greater than 55 percent of total component cost. Here is exactly how that math works, with numbers.

21 Jul 2026 4 min
Battery storage

BABA compliance for battery storage: a determination guide

How BABA applies to battery storage: which BESS enclosures, racks, cells and inverters face the 55 percent test, and how to run a determination.

19 Jul 2026 3 min
Waivers

How to get a BABA waiver: the process, step by step

How to get a BABA waiver: identify the right category, build the evidence, and submit the request to your funding agency for OMB review. A clear walk-through of the five waiver types and what each one needs.

19 Jul 2026 4 min
Developers

A Buy America compliance API for estimating and agents

A Buy America compliance API returns a cited BABA verdict from a bill of materials, so estimating software and AI agents can run a determination mid-task. Here is what the endpoint does and how to call it.

18 Jul 2026 3 min
Agencies

Which agencies enforce BABA? A cross-agency guide

Which agencies enforce BABA and how their guidance differs: OMB sets the government-wide baseline, and FHWA, EPA SRF and USDA Rural Development apply it to their programmes. Here is who does what.

18 Jul 2026 3 min
EPA SRF

EPA SRF BABA compliance: a guide for water projects

EPA SRF BABA compliance explained for Clean Water and Drinking Water projects: how the domestic-content rules reach SRF-funded work, what counts, and how to run a determination for pipe, pumps and plant.

17 Jul 2026 3 min
Adjacent laws

BABA vs Buy American Act vs Buy America: what differs

BABA vs the Buy American Act vs Buy America: which domestic-preference law applies when, what each covers, and how the thresholds differ.

17 Jul 2026 4 min
USDA Rural Development

USDA Rural Development BABA requirements, explained

USDA Rural Development BABA requirements for rural water, broadband and infrastructure grants: which items are covered, how the three categories apply, and how to run a determination for a smaller project team.

16 Jul 2026 3 min
FHWA

FHWA Buy America domestic content: the highway guide

FHWA Buy America domestic content, explained for highway bidders: how the steel and iron rules and BABA manufactured-product test apply to federal-aid projects, and where teams most often slip.

16 Jul 2026 3 min
Buy vs build

BABA compliance software vs a consultant: how to choose

BABA compliance software vs a consultant: when self-serve software is enough, when you need expert advice, and how to combine both.

15 Jul 2026 4 min

A guide explains the rule. Your bill of materials decides the verdict.

Run your own BOM through the determination engine, cited to the OMB and agency source, or read the exact agency thresholds before you bid.